MUDDY CREEK PURCHASES TIMERS FOR THE DEWALT CHALLENGE

Dewalt is sponsoring the America’s Ultimate Contractor Challenge.  This is a timed challenge where the contestants use a Dewalt power drill to screw in several screws with the winner being whoever has the fastest time.

Muddy Creek recently purchased DC-40T-UP-TERM timers to build displays for the Dewalt Challenge.  The DC-40T-UP-TERM timers count up only.  The DC-40T-UP is a four inch digit with a viewing distance of 200 feet.  Muddy Creek purchased a red start/stop button to activate the timer.  The standard DC-40T-UP timer comes with top mounted switches or a radio frequency remote.

DC-Digital, Countdown Timer, Appellate, Courtroom, Speech Timer, Portable Battery, 12 volts, Red LED, Master-Secondary enclosure
Countdown Timer
Speech Countdown Timer w/ Wireless Remote Controller for Courtrooms

The DC-40T-DN-W-System is engineered to regulate the flow of time-limited speeches in a courtroom setting. Whether used for opening arguments, rebuttals, or judicial presentations, this system guarantees accurate countdown timing to ensure all parties adhere to allotted time slots. Tailored specifically for legal environments, this custom-built solution ensures that time …

hands free foot switch activated Start-Stop-Reset to last value countdown process timer
Timers
Foot-Switch Hands Free Process Countdown timer with NEMA 4X Sealed Enclosure

Introducing our Footswitch Operated Hands-Free Process Countdown Timer, designed to deliver precision timing control in tough environments. This rugged timer is housed in a durable NEMA 4X polycarbonate enclosure, ensuring excellent protection against dust, water, and harsh conditions—perfect for industrial and outdoor applications. The unit features environmentally sealed set switches …

NEMA Enclosed, Master-Secondary, Andon light, WR-6T-NEMA Controller, Dry Mix Batch Timer, Countdown Timer
Countdown Timer
Multi-Level Food Processing Timer & ANDON System w/wired remote controls

DC-Digital created the multi-level (between first and second floor) food processing timing system for food processing plant. At the onset of beginning of the process the top floor (Second floor) presses the start button all the while, on both displays, the preset timing begins and the ANDON light illuminates yellow …